Български
English
БГ
EN
About us
Activities
Projects
Capacities
News
Contacts
About us
Activities
Projects
Capacities
News
Contacts
Portfolio Category : [:bg]Всички[:en]All[:]
Home
/ Portfolio Category /
[:bg]Всички[:en]All[:]
All
Reconstruction of Road I-9 Sunny Beach-Burgas from km 212 + 223 to km 217 + 000
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Bratovo-West Regional Landfill: Farmyard, Temporary Waste Storage Building, Separation Building, Composting and Ready-Made Compost Buildings, Administrative Building, Local Wastewater Treatment Plant and Ecopark
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Reconstruction of inter-block space in RLE I, block 22A, Zone B Meden Rudnik Quarter, Burgas and a service street
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Construction of a network of bicycle lanes outside the route of the Stage I bus line in the area of the central city part and the adjacent districts of Burgas
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Technical design and Construction (Engineering) for Project: Hemus Highway, section from km 78+500 to km 87+800
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Lot 4 – Road II-29 Varna-Dobrich from km 20+394,73 to km 23+199,86 and from km 25+344 to 38+100,31 with a total length of 15,563 km, Varna and Dobrich Districts
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Engineering – Design and Construction “Northern Speed Tangent from km 0+000 to km 16+540”
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Reconstruction of the bridge over the Marash River on the road I-7 Shumen – Yambol – Granitovo – Lesovo at km 228 + 681
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Repair and maintenance of street, road and sidewalks on the territory of Burgas Municipality
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Engineering obstruction facility on the land part of the Bulgarian-Turkish border for the route of Burgas District
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Reconstruction of Kraezerna Street, construction of Overpass of Freight Railway Station, connection with road junction at Odrin Street and Kraezerna Street, Burgas
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Research, design and execution of works on crashed bridge over Ropotamo River at km 16 + 257 on road III-992 Veselie – Yasna Polyana
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Rehabilitation of municipal roads connecting the villages of Bulgari and Kosti to the Tsarevo municipal center and the Republican road network through the II-99 border with Romania – Varna – Burgas – border with Turkey
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Design and construction of the Karnobat Waste Transmission Station under a project: “Construction of a Regional Waste Management System in the Burgas Region”, funded under OP “Environment 2007-2013”
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Construction of sub-projects at the Bratovo-West Regional Landfill and site infrastructure in land of Polski Izvor village, Kameno Municipality, Burgas District
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Repair and maintenance and winter maintenance of roads and road facilities – Burgas District
[:bg]Всички[:en]All[:]
·
[:bg]Текущи[:en]Current[:]
0